PETROCHEMICALS
Petrochemicals
COMPANY NAME : Tasnee Petrochemicals SAUDI ARABIA
PROJECT : Flexibility / Stress Analysis Study on Propane Dehydrogenation reactors Hydrocarbon header System
PROJECT TYPE : Stress Analysis
MAN HOURS : 2500
SCOPE OF WORK :
Stress analysis study and redesign of the Propane Dehydrogenation Reactor Hydrocarbon Header. 48″ header at 649°C temperature & 2.76bar pressure having 25 expansion joints in 300meter straignt length.